Details of Aberdeen Facility

Infrastructure

eP Aberdeen moved into their purpose built facility erected on Kirkhill Industrial Estate on 3rd October 1998. The workshop is fully equipped with overhead cranes and all the necessary equipment to build, maintain and store Workover Control Systems and Wellhead Control Panels.

Aberdeen Facility

  • Warehouse 9,116 ft square
  • Office 5,886 ft squareAberdeen Facility
  • Tarmac Yard 2,112 yards square
  • Parking for 52 cars
  • Close circuit TV in all areas
  • Total site area 1.3 Hectares

Aberdeen Workshop Facility

  • Overhead crane 16 ton
  • Test bay 40,000 PSI
  • Outside stack up area - Excess of 100 ton loadings
  • Clean room - Calibration and NAS standards
  • Wash bay facility
  • Indoor/Outdoor Storage can be arranged

Copyright © 2008 eProduction Solutions, Incorporated. All rights reserved.